Primary filters
Illustrated Guide to Ventilation (BG 2/2009), compiled by Kevin Pennycook and published by BSRIA in 2009, states : ‘Primary filters (Grade G1 to G4) have an average arrestance ranging from 50 – 90%. Average arrestance is the amount of dust retained as a percentage of the total load (a ratio). Primary filters can arrest particles down to 5 um but have a minimal effect on particles below 1 μm. Air velocity through primary filters is an average of 2 m/s, and the pressure drop rises from 10-60 Pa when clean to 125-250 Pa when dirty. These filters can be permanent and cleanable (made of foam or metal mesh) or disposable (made of a glass or synthetic media). Primary filters are mainly used to protect ventilation and air conditioning equipment (if building use does not require filtered air), or as pre-filters to extend the operating life of fine filters installed further downstream.’
--BSRIA
[edit] Related articles on Designing Buildings
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.